The most constructive criticism I've read was that they should be drilling more than two side wells. The claim was that historically each well has about a 60% chance of working, so counting on only two is too risky. Maybe they're a lot better at doing this now than the 60% figure, but given the multiple-month lead time, it does seem like starting up a couple more drilling operations would be a good step.