Quote:

Nobody paid much attention until we heard it on the radio and someone asked how much shaking the nuke box can withstand.


Contrary to the information released by Tempco the Fukishima reactors were reported to have began melting down before the Tsunami hit and took out the backup Diesel gen sets. I think that most reactor documentation requires the recording of X-ray welds to the plumbing which keeps the whole pile cool i.e static pressure testing. I don't think that the welds are tested for shear forces so even a relatively minor earthquake could prove to be quite disastrous.

http://vimeo.com/27481567 crazy crazy crazy

Just goes to show that even a reactor can begin to fall apart quite drastically just to lack of maintenance and rodents chewing cables. wink


BTW I hope the radioactive fall out mentioned in a previous thread (postulated that it was a buildup of Radon Gas in the atmosphere) doesn't herald a massive quake in the next few weeks.

http://forums.equipped.org/ubbthreads.php?ubb=showflat&Number=229952#Post229952



Edited by Am_Fear_Liath_Mor (08/23/11 11:48 PM)