I read from one of the coaches (I think) that basically they pop the rim of the roof, pull off the cloth, and replace it. Hit the generator, it inflates, and voila! New roof.
Kind of like a big honking bike tire.
A bit on NPR said that the last time it collapsed the repair only took three days. Which is long for changing a tire but shockingly fast for such a large construction.