The real fun is it won't be running for at least a week - lot of stuck passengers
It might be longer than that, these train breakdowns might not be related to any mechanical issues or electrical breakdowns due to condensation as speculated, it could well be down to a few lines of software code, such as software Integrator control limits being saturated for a temperature sensor somewhere, which causes an exception and shuts down the motor/switching power supply controller computer. It might be very very difficult to find out what might be causing these failures.