I think that in most places the generator will not be able to have a load put on it, when it is cranked up for only a scheduled exercise. If you put a load on it, the load would need to be for providing power to something off the grid. Anything else risks running power back into the grid, which I something I am sure that the power companies do not want to happen if it's not within their power to manage.